SUSTAINABLE BASE LOAD ELECTRICITY for 3 cent per kWh

The Rosch Kinetic Power Plant cleverly exploits the physical laws of nature to produce an abundance of electrical energy at an affordable price for many years.

It does not use fossil fuels, wind, sunlight or nuclear power, making it completely CO2-free and extremely environmentally friendly.

Electricity from the Rosch Kinetic Power Plant meets the EU’s strictest requirements for green electricity.

The Rosch Kinetic Power Plant can generate all your electrical energy 24/7.

Factories, businesses, communities and residential areas can be directly connected to the power plant.

This technology is well suited for decentralised power generation in a micro-grid. There is no need to connect to the high voltage grid as the electricity is generated where it is used.

As an added bonus, the price of electricity can be as low as 3 cents per KWh in ideal circumstances.

The operation of the Kinetic Power Plant has been validated by independent institutes such as TUV, DEKRA and SCS.

The Kinetic Power Plant produces electricity 24/7 in Thailand.

Rosch Kinetic Power Plants are now available for rollout.

ADVANTAGES OF THE KINETIC POWER PLANT ENERGY SYSTEM

  • Low kWh price
  • No fossil fuel
  • Always green power (24 hours a day 7 days a week)
  • Generates power where it is used
  • Completely emission free, no pollution, no CO2, no particulate matter
  • Low installation costs
  • Small area needed compared to solar meadows and windmills
  • Independent of sun and wind always provides power
  • Independence from the power grid is possible
  • Low operating costs due to low wear and tear
  • Very reliable due to simple construction
  • No horizon pollution as with wind turbines gas/coal/nuclear power plants
  • No danger of radioactive radiation as in the Fukushima and Chernobyl nuclear disasters
  • Resistant to missile, drone and sabotage attacks
  • Fully recyclable, no waste

How the Rosch Kinetic Power Plant works

In the video below, we explain how the Rosch Kinetic Power Plant works.

With the Kinetic Power Plant you can generate all your base load electricity for your factory or business without being connected to the grid for 3 cents per kWh.

OVERVIEW OF THE STANDARD SYSTEMS

Kinetic Power Plant 7 MW

Rosch Kinetic Power Plant 1.5 MVA

Supplies electricity 24/7
Output power: 1.5 MVA
COP: greater than 20
Lifetime: 20 years
Annual production: 13 GWh
Avoided CO2 6,870 tons

Rosch Kinetic Power Plant 7 MVA

Supplies green power 24/7
Output power: 7 MVA
COP: greater than 20
Lifetime: 20 years
Annual production: 61 GWh
Avoided CO2 32.000 tons

Selling price overview of the Kinetic Power Plants

  • Rosch Kinetic Power Plant 1.5
  • Output power: 1.5 MVA
  • COP: greater than 20
  • Surface area: 150 m2
    Lifetime: 20 years
  • Annual production: 13 GWh
    Avoided CO2 6,870 tons
  • Equivalent to 2 wind turbines of 3MW
    Equivalent to 31,000 solar panels
    (In Netherlands)
  • Delivery time: by agreement
  • Price (turnkey delivery):
    EUR 4.000.000,-
  • Rosch Kinetic Power Plant 7
  • Output power: 7 MVA
  • COP: greater than 20
  • Surface area: 1500 m2
    Lifetime: 20 years
  • Annual production: 61 GWh
    Avoided CO2 32.000 tons
  • Equivalent to 8 wind turbines of 3MW
    Equivalent to 124,000 solar panels
    (In Netherlands)
  • Delivery time: by agreement
  • Price (turnkey delivery):
    EUR 19.500.000,-
  • Rosch Kinetic Power Plant 28
  • Output power: 28 MVA
  • COP: greater than 20
  • Surface area: 4000 m2
    Lifetime: 20 years
  • Annual production: 245 GWh
    Avoided CO2 136.000 tons
  • Equivalent to 30 wind turbines of 3MW
    Equivalent to 700,000 solar panels
  • Delivery time: by agreement
  • Price (turnkey delivery):
    EUR 78.000.000,-
  • Rosch Kinetic Power Plant 56
  • Output power: 56 MVA
  • COP: greater than 20
  • Surface area: 6000 m2
    Lifetime: 20 years
  • Annual production: 500 GWh
    Avoided CO2 272.800 tons
  • Equivalent to 60 wind turbines of 3MW
    Equivalent to 1.400 .000 solar panels
  • Delivery time: by agreement
  • Price (turnkey delivery):
    EUR 156.000.000,-

Last updated on: February 20, 2023

Turnkey delivery

Turnkey in Europe means:

– You provide the land, the connection to your network and the necessary permits.

Turnkey outside Europe means:

The client pays the costs associated with:
– the connection to your network and the necessary permits.
– importing all the goods into your country including taxes, transportation, levies, etc.,
– applying for the necessary local and government permits to build and use a KPP
– the land on which the KPP will be built.

zilverstroom Power Purchase Agreement

License-System

To enable the rapid worldwide  rollout of this technology, a licensing system has been developed.

Our intention is to give the business into local hands.

Look for more information here

Visiting a Rosch Kinetic Power Plant

We regularly receive questions about the possibility of visiting a Rosch Kinetic Power Plant that produces electricity. This question is obvious because the energy system generates a lot of power at extremely low kWh costs.

Companies considering purchasing a Kinetic Power Plant want to see it working. There are also companies that want to conduct their own measurement campaign as part of the purchase process. After all, the Kinetic Power Plant is a new appearance on the green energy scene with which a lot of green power can be generated cheaply.

The Kinetic Power Plant can be visited by invitation only.

Save The Planet Asia has set up two units in Thailand at their R&D site. Here visitors can see two Kinetic Power Plant energy cells in operation. These units provide 100KVA and 500KVA respectively and are set up so that the visitor can see almost all the components up close during operation.

The 100 KVA power cell is set up in a micro-grid configuration. This unit, which is not connected to the grid, provides all the power for lighting, air conditioning, freezers, electrical tools, computer network, etc. for the R&D buildings.

The second unit which has a capacity of 500KVA does connect to the public electric grid. This energy cell provides 24/7 electric power to the Thai grid.

Visitors considering purchasing a Kinetic Power Plant are welcome to visit Thailand.

Commercial agents wanted!

Zilverstroom Energy is looking for commercial agents for a number of countries in Africa and Europe.

A ROSCH KINETIC POWER PLANT GENERATOR TUBE BUSY PRODUCING LOTS OF KWH HOURS.

kinetic power plant floaters moving

CONTACT

For more information and advice on Zilverstroom Energy products and services,
please contact us using the contact information below.

Zilverstroom Energy B.V.
Kapitein Rondairestraat 1c
5015 BC Tilburg
Netherlands

phone: +31 (88) 0306350
email: sales@zilverstroom.com

Facebook: zilverstroomenergy

© Copyright - Zilverstroom Energy B.V.